Oberhausen, Ruhr area, North Rhine-Westphalia, Germany - Emscher conversion, new construction of the Emscher AKE sewer, here the inlet channel from the Oberhausen pumping station, test run, the pumping station will be flooded as a test, the pumps will also be tested, which in the future will pump 16,000 liters of wastewater per minute, ecological The conversion of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries.
Size: 5464px × 8192px
Location:
Photo credit: © Rupert Oberhäuser / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: -, aeration, ake, ambience, architecture, area, array, blue-green, build, build-, building, buildings, builds, canal, central, civil, color, colored, colorful, colour, coloured, colourful, concrete, conservation, consists, construct, constructing, construction, conversion, critical, deep, disposition, dyed, eco, ecological, economica, economics, economy, edifice, edifices, emscher, engineering, environment, facade, germany, green, industry, infrastructure, north, oberhausen, pumping, renaturation, rhine-westphalia, ruhr, sewage, sewer, sewers, site, station, structure, system, trade, trades, treatment, tributaries., ventilation, work, works