. The design of a hydro-electric plant at Ottawa, Illinois . 34. Electrical, The load curves show that the load vnrie3 for different times in the3/ear. In the month of December there is a very much greater demand than theis in thr? month of June. The peak load in December is about ?7,000 kilo-watts and this vrill b^ the quanity that is to decid^^ the capacity of theplant. In June the peak load calls for 23,000 kiro-vratts. This \frillthen necessitate that some of the units remain idle durinp; the summermonths. Hov/ever this is more economical then it v?-ould be to install Anamxiliary plant for


. The design of a hydro-electric plant at Ottawa, Illinois . 34. Electrical, The load curves show that the load vnrie3 for different times in the3/ear. In the month of December there is a very much greater demand than theis in thr? month of June. The peak load in December is about ?7,000 kilo-watts and this vrill b^ the quanity that is to decid^^ the capacity of theplant. In June the peak load calls for 23,000 kiro-vratts. This \frillthen necessitate that some of the units remain idle durinp; the summermonths. Hov/ever this is more economical then it v?-ould be to install Anamxiliary plant for the winter overload. For practically 9 hours in the day during the v,inter months thereis a load of 15,000 For hours durinp; the day there is apnroximately10,000 being used and for the remaining 9 hours the full capacityof the station is needed. From the above figures it ;voi;ld seem that unitsof 5000 K.^V. capacity would be best. Two units then could carry the 10, load and the third unit could be pa^all^d for the 15,000


Size: 1326px × 1884px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1910, booksubjecthy, booksubjecttheses