Workmen move a wind turbine nacelle at Mostyn docks, Wales


Dong Energy are building the Walney offshore wind farm, off the Cumbrian coast, UK. When finished the farm will consist of 102, MW turbines, giving a total capacity of the Walney project of MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The turbines are shipped into the UK and stored at Mostyn port in North Wales. From here they are picked up by a jack up barge, that sails out to the construction site to build the turbines. This shot shows a workman using a remote control unit for manouvering a specialist low loader, which is used to move heavy turbine pieces around.


Size: 5616px × 3744px
Photo credit: © Ashley Cooper pics / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: blade, coast, construction, control, crane, docks, dong, electricty, energy, farm, hard, hat, health, helmet, high, huge, lifting, loader, loading, mostyn, nacelle, north, offshore, orange, port, power, ppe, reflective, remote, renewable, safety, siemens, trailer, turbine, unit, vis, wales, wharf, wind, workman