A helicopter lifts part of a hoist inside a control tower at the East Branch Clarion River Lake in Wilcox, Pennsylvania, June 14, 2021. The control tower is original to the dam, which was completed in 1952. East Branch Dam has prevented flood damages estimated to be more than $98 million, equivalent to $456 million in today’s dollars.
Size: 2092px × 1195px
Photo credit: © Operation 2021 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: army, dam, district, engineers, helicopter, pittsburgh, usace