Report of the Commission appointed to Inquire into Matters Connected with the Public Buildings at Ottawa . 1 112 80 15 95 65 53 39 80 57 00 6 00 2 50 53 93 53 93 353 56 169 67 48 50 12 25 26 82 4 80 92 37 83 41 108 00 9 00 105 00 21 00 18 00 2,-i 00 18 85 5 60 11 00 20 00 30 00 1 30 00 40 00 10 00 12 00 2 40 0 90 14 00 1 60 1 42 1 42 486 77 403 OS 155 43 113 66 58 52 16 80 12 25 5 00 3 50 4937 50 3520 07 164 SCHEDULE Buildings.—Measurement of Plant, &c.—Continued. Brought forward. Sundries in Store House.—Continued. 15 10-inch single-tackle blocks, 150 inches (wood), 2 8-inch do


Report of the Commission appointed to Inquire into Matters Connected with the Public Buildings at Ottawa . 1 112 80 15 95 65 53 39 80 57 00 6 00 2 50 53 93 53 93 353 56 169 67 48 50 12 25 26 82 4 80 92 37 83 41 108 00 9 00 105 00 21 00 18 00 2,-i 00 18 85 5 60 11 00 20 00 30 00 1 30 00 40 00 10 00 12 00 2 40 0 90 14 00 1 60 1 42 1 42 486 77 403 OS 155 43 113 66 58 52 16 80 12 25 5 00 3 50 4937 50 3520 07 164 SCHEDULE Buildings.—Measurement of Plant, &c.—Continued. Brought forward. Sundries in Store House.—Continued. 15 10-inch single-tackle blocks, 150 inches (wood), 2 8-inch do do 2 8-inch do do 5 10-inch double-tackle blocks, 3 8-inch do do3 8-inch do do 188 pounds new rope, at 100 do lamp black, at 1 barrel rosin 16 166 50 24 74 dododododo dododododo First Cost. 0 12*. 0 20. 0 11 per lb. J0 10 do Depreciated value Total plant in western block. $ 50 20 75 14 80 20 6810 0017 00 83 23 5020 73 PresentValue. $ ,520 07 328 37 3848 44 Departmental Buildings.—Measurement of Plant in Brickyard. Brickkiln Shed :— 3818 feet B. M. lumber, at $10 00 per 2401622764y6 do cedar posts, at. do do at do tamarac do, at do common slabs, at. 0 10 07 do0 05 do7 00 per M. Depreciated value. Drying Shed and Sundries in Brickyard:— 4207 feet B. M. lumber,at $10 00 per M. 8640 do common slabs, at 7 00 do 22 wheelbarrows (earth), at 2 50 each. 10 do (brickmakers), at 3 50 do 4 brickmaking machines, at 80 00 do 2 cast iron rollers, at 20 00 do 154 feet 1-inch gas pipe, at 0 22 per ft. Depreciated value. Carried ov»r. 38 1824 0011 3413 803 47 90 79 42 0760 4855 0035 00320 0040 0033 80 586 35 677 14 $ cts. 54 48 501 10 555 58 1G5 SCHEDULE M. Departmental Buildings.—Measurement of Work in Brick Yard.—Continued. Brought forward. Racks in Brickfield :— 128130 feet B. M. lumber, at $10 00 per M. 1800 do codar posts, at 0 07 per ft. 3000 do tamarac do, at 0 05 do Depreciated value. Office and Tools in Brickfield :— 1184 feet B. M. lumber


Size: 2129px × 1174px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., book, bookcentury1800, bookdecade1860, booksubjectpubliccontracts