Pacific Gas and Electric magazine . ry that the companj has de-cided it can afTord to operate its plantwith Pacific Service without fear ofinterruption to its business, and to thatend, and instead of installing steam ma-chinery to generate power for its ownuse, it has just installed a new substationcontaining four 500 k. v. a. transformers,and will hereafter purchase practicallyall the power it requires for driving ma-chinery from Pacific Service. Thesetransformers are located on the northside of the Southern Pacific railroadtracks, and are connected to our SouthTower station by two sets of le
Pacific Gas and Electric magazine . ry that the companj has de-cided it can afTord to operate its plantwith Pacific Service without fear ofinterruption to its business, and to thatend, and instead of installing steam ma-chinery to generate power for its ownuse, it has just installed a new substationcontaining four 500 k. v. a. transformers,and will hereafter purchase practicallyall the power it requires for driving ma-chinery from Pacific Service. Thesetransformers are located on the northside of the Southern Pacific railroadtracks, and are connected to our SouthTower station by two sets of leads, wiiichleads cross the railroad tracks on a highdouble pole-line, a piece of work whichdoes credit to the engineers resijonsibiefor its new suiista-lion, which has beeninstalled under the , direction of our en-gineers from draw-ings preparcii l)\llicm, is one tli;il Ihcsugar company iii:iylie proud of. The rrllnery at Crockett isilillerent in one resped from nlmnsl;iny oliici iii;iMii Iiir-liirv using clciliic.
Size: 1754px × 1425px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookauthorpacificgasandelectric, bookcentury1900, bookdecade1900