Backhoe loader seen during work at the modernized waste sorting plant in Zaklad Utylizacyjny Szadolki. Modernization works cost PLN million. Thanks to this modernized installation plant will be able to recover much more raw materials from residual waste as well as plastics and metals to optimize the plants operating costs.


Size: 3250px × 2165px
Photo credit: © SOPA Images / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: backhoe, garbage, modernization, modernized, plant, sorting, szadolki, trash, utylizacyjny, waste, work, zaklad