![](http://www.alamy.com/thumbs/6/51FFA032-020C-4846-A8A4-6B157DEA97BC/2M5BHHF.jpg)
KINGS BAY, Ga. (Feb. 22, 2022) A contractor works on replacing the concrete on the walls of the basin of the dry dock at Naval Submarine Base Kings Bay, Georgia. The $592 million Naval Facilities Engineering Systems Command (NAVFAC) Southeast dry dock recapitalization project began in the summer of 2020, and is slated to be completed in April 2023.
Size: 3508px × 4912px
Photo credit: © NB/IA / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: bay, dock, dry, facility, kings, navfac, recapitalization, refit, trf, trident