. The Street railway journal . VIEW OF MAIN HEADER AND CONNECTIONS which are connected to the stepdown transformer taps togive a voltage of 170, 320 or 440 for starting the convertersfrom the a. c. side. There are also three 400-kw, 2300/-22,000-volt transformers for the transmission line toClarksburg. INTERIOR VIEW OF CAR HOUSE busbar. As a rule the day load calls only for one looo-kwand one 500-kw unit, the second 500-kw going into servicein the evening. The regulation is all that can be expected,the variation in voltage on the secondaries not exceeding;two volts with the swing of the load.


. The Street railway journal . VIEW OF MAIN HEADER AND CONNECTIONS which are connected to the stepdown transformer taps togive a voltage of 170, 320 or 440 for starting the convertersfrom the a. c. side. There are also three 400-kw, 2300/-22,000-volt transformers for the transmission line toClarksburg. INTERIOR VIEW OF CAR HOUSE busbar. As a rule the day load calls only for one looo-kwand one 500-kw unit, the second 500-kw going into servicein the evening. The regulation is all that can be expected,the variation in voltage on the secondaries not exceeding;two volts with the swing of the load. May 16, 1908.] STREET RAILWAY JOURNAL. 811 The operating force consists of a chief engineer, oneengineer, one assistant engineer and one fireman on eachshift of 12 hours. TRANSMISSION LINE AND SUBSTATIONS The three-phase, 22,000-volt transmission line extendsfrom Fairmont to Clarksburg, a dis-tance of 24 miles. The transmissionpoles are of chestnut 35 ft. long andset 5 ft. in the ground. They arespaced 100 ft. apart and carry


Size: 1570px × 1592px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1800, bookdecade1880, booksubjectstreetr, bookyear1884