. Electric railway journal . Top Block, Top View Bottom tievtlun of Form ( bide View ) in Top Block. Side View •--6?--f»-4-V - / 2x i 1—6^ I*—5 Top View of Bottom Clamp BoltB Electric Method of Making Splice Concrete Poles in Syracuse—Details of Construction of Wooden Forms this reinforcing are shown in the drawing on page 502. 30-ft. pole with 6-in. top which had been adopted tenta- The poles with 8-in. tops have the same arrangement of tively. In this test two poles were set about 38 ft. apart rods, all %i in. instead of y> in. The longer poles have with a 15-in. rake. A ring


. Electric railway journal . Top Block, Top View Bottom tievtlun of Form ( bide View ) in Top Block. Side View •--6?--f»-4-V - / 2x i 1—6^ I*—5 Top View of Bottom Clamp BoltB Electric Method of Making Splice Concrete Poles in Syracuse—Details of Construction of Wooden Forms this reinforcing are shown in the drawing on page 502. 30-ft. pole with 6-in. top which had been adopted tenta- The poles with 8-in. tops have the same arrangement of tively. In this test two poles were set about 38 ft. apart rods, all %i in. instead of y> in. The longer poles have with a 15-in. rake. A ring of concrete was placed at the the rods lengthened at the top ends. The cost of the butt of each pole and at the ground line. A span wire.


Size: 2039px × 1225px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookidelectricrailway411913newy