A broken portion of John Day Lock and Dam’s upstream navigation lock gate has slowed river traffic through that portion of the Columbia River. Army Corps technicians found the damage to a lower guide wheel July 25, 2022, and began repairs immediately, while maintaining lock operations, limiting the impact on the passage of commercial and recreational vessels. John Day Lock & Dam is located 216 miles upriver from the mouth of the Columbia River near the city of Rufus, Ore. Dedicated in 1968, construction of John Day Lock & Dam was completed in 1971. The project, which consists of a n
A broken portion of John Day Lock and Dam’s upstream navigation lock gate has slowed river traffic through that portion of the Columbia River. Army Corps technicians found the damage to a lower guide wheel July 25, 2022, and began repairs immediately, while maintaining lock operations, limiting the impact on the passage of commercial and recreational vessels. John Day Lock & Dam is located 216 miles upriver from the mouth of the Columbia River near the city of Rufus, Ore. Dedicated in 1968, construction of John Day Lock & Dam was completed in 1971. The project, which consists of a navigation lock, spillway, powerhouse and fish passage facilities, is authorized for navigation and hydroelectric power generation. Various recreational facilities are provided along Lake Umatilla and the John Day River.
Size: 5184px × 3456px
Photo credit: © Operation 2022 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: