Construction work is shown May 18, 2022, in the 1600 block of the cantonment area at Fort McCoy, Wis., on a second new transient training troops barracks project on the post. The $ million project was awarded to Black Constructors, which is the contractor who built the first barracks building at Fort McCoy, according to the Army Corps of Engineers Resident Office at Fort McCoy. The new contract was awarded Sept. 29, 2020, and the notice to proceed was issued Oct. 28, 2020. The contract duration is scheduled for completion in 780 calendar days. Currently contract completion is sch


Construction work is shown May 18, 2022, in the 1600 block of the cantonment area at Fort McCoy, Wis., on a second new transient training troops barracks project on the post. The $ million project was awarded to Black Constructors, which is the contractor who built the first barracks building at Fort McCoy, according to the Army Corps of Engineers Resident Office at Fort McCoy. The new contract was awarded Sept. 29, 2020, and the notice to proceed was issued Oct. 28, 2020. The contract duration is scheduled for completion in 780 calendar days. Currently contract completion is scheduled for December 2022. The barracks is different than the traditional barracks located throughout the installation. This new building will be four stories and able to house 400 people in approximately 60,000 square feet. The building is being built with the latest in construction materials and include state-of-the-art physical security and energy-saving measures. The project also is part of the Fort McCoy Master Plan that looks at continuously upgrading the installation’s infrastructure to be prepared for the future. The Army Corps of Engineers is managing the project.


Size: 3795px × 2847px
Photo credit: © Operation 2022 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: army, barracks, construction, corps, engineers, fort, mccoy, modernization, wisconsin