SKATE 3E drilling rig from Immingham test drilling at dawn the Tyne riverbed for the new North Shields ferry terminal


This small rig was being used to test the river bed in the Tyne due to the forthcoming construction of a new cross Tyne ferry landing


Size: 8192px × 5462px
Location: North Shields Tyne and Wear
Photo credit: © Wilf Doyle / Alamy / Afripics
License: Royalty Free
Model Released: No

Keywords: abstract, aluminium, angles, barge, benchmark, building, concept, construction, crane, cranes, drill, drilling, ducts, electricity, encoder, ferry, gas, geodetic, glass, industry, infrastructure, jack, landing, legs, levelling, maintenance, measuring, mining, mud, north, oil, outdoors, oxide, painting, pipes, piping, positioning, power, rig, rotary, shields, ship, sites, steel, surveying, towers, transport, tunneling, turbine, vectors, winch, wind