Mid-construction view of the interior of a paint booth in B404, the Paint, Blast and Rubber consolidation project (P293). The paint booth will be 48-ft wide by 44-ft deep by 20-ft high with a suspended trolley system for hanging and maneuvering parts to be painted.


Size: 4896px × 3672px
Photo credit: © Operation 2022 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: navfac, oiccpnsy, pnsy, siop