. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. (BUILT 1920-,931) SECTION OF PIERS (BUILT 1910 -1919) Slont Protictlon. ELEVATION VARIES WEST PIER EAST PIER TYPICAL SECTIONS OF REPAIR EAST AND WEST PIERS (1962-1963) EAST PIER (1974) (CHANNEL SIDE) Noewira Fobric 74 TH Roa >70TopolCronulot Fill. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert


. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. (BUILT 1920-,931) SECTION OF PIERS (BUILT 1910 -1919) Slont Protictlon. ELEVATION VARIES WEST PIER EAST PIER TYPICAL SECTIONS OF REPAIR EAST AND WEST PIERS (1962-1963) EAST PIER (1974) (CHANNEL SIDE) Noewira Fobric 74 TH Roa >70TopolCronulot Fill. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. Army. Corps of Engineers; Repair, Evaluation, Maintenance, and Rehabilitation Research Program. [Vicksburg, Miss. : U. S. Army Engineer Waterways Experiment Station ; Springfield, Va. : available from National Technical Information Center]


Size: 2194px × 1139px
Photo credit: © Book Worm / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., boo, bookauthorunitedstatesarmycorpsofengineers, bookcentury1900