SETTLING POND FOR THE WET SCRUBBER OPERATION OF FURNACE #36 AT THE UNION CARBIDE FERRO-ALLOY PLANT. THE POND IS DREDGED PERIODICALLY AND THE SLUDGE IS USED FOR LANDFILL. TOTAL PLANT EMISSIONS WERE REDUCED PERCENT BETWEEN 1967 AND 1975. A COMPLIANCE SCHEDULE WAS REACHED BETWEEN THE COMPANY AND THE WEST VIRGINIA AIR POLLUTION CONTROL COMMISSION. EPA STACK SAMPLED PLANT EMISSIONS WHILE DEVELOPING NATIONAL NEW SOURCE PERFORMANCE STANDARDS. (SEE FICHE #141 TO 146)


Size: 3672px × 5446px
Photo credit: © Alpha Stock / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: