. Electric railway review . he Illinois river. and to make a complete shut down of the station unnecessaryin case of accident to any part the machinery, boilers andpiping, in so far as advisable, are arranged according to theunit plan. The building is of fireproof construction. Steel is usedwherever desirable. All walls except those of the coal andash pit are brick, laid in cement mortar. All brick used isvitrified paving brick (paving block size). The exterior sur-faces and the faces of the walls in the turbine room are laidin red mortar. The floors are steel-beam and concrete-archconstructio


. Electric railway review . he Illinois river. and to make a complete shut down of the station unnecessaryin case of accident to any part the machinery, boilers andpiping, in so far as advisable, are arranged according to theunit plan. The building is of fireproof construction. Steel is usedwherever desirable. All walls except those of the coal andash pit are brick, laid in cement mortar. All brick used isvitrified paving brick (paving block size). The exterior sur-faces and the faces of the walls in the turbine room are laidin red mortar. The floors are steel-beam and concrete-archconstruction, the spans and size of beams being carefully se-lected for the probable loadings in different parts of the sta-tion. The roof is reinforced cinder concrete covered with tarpaper and gravel. AH skylights are % inch thick roughtransparent wire-glass. All of the high-voltage electrical apparatus and connec-tions are placed in what is practically a separate building,there being only one door leading from the main station into. Peoria Power Station, Illinois Traction System —Vertical Section through Boiler Hcuse. Turbine Room and Hlgh-Tension Compartments. It immediately adjoins the approach to the new steel bridgewhich the Illinois Traction System is building across the Illi-nois river. The site is at the corner of Walnut and Waterstreets, near the center of the city and in the same cityblock with the old power station. When the new plant is insatisfactory operation the old station will be dismantled andthe site used for an interurban passenger of Building. In connection with the selection of apparatus and thedesign of the station the operating engineers work was givendue consideration. All operating apparatus, except the boilersand coal-handling machinery, are controlled from the turbine-room floor and the arrangement is such that ordinarily oneengineer on watch may attend to two turbines and the aux-iliary machinery, including the condenser equipment, feed


Size: 2104px × 1188px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, booksubjectstreetr, bookyear1906