. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. ELEVATION VARIES WEST PIER EAST PIER TYPICAL SECTIONS OF REPAIR EAST AND WEST PIERS (1962-1963) EAST PIER (1974) (CHANNEL SIDE) Noewira Fobric 74 TH Roa >70TopolCronulot Fill. TYPICAL SECTION OF REPAIR TO WEST PIER - 1958 Figure 288. Typical structure cross sections Great Sodus Bay Harbor, New York 419. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may n


. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. ELEVATION VARIES WEST PIER EAST PIER TYPICAL SECTIONS OF REPAIR EAST AND WEST PIERS (1962-1963) EAST PIER (1974) (CHANNEL SIDE) Noewira Fobric 74 TH Roa >70TopolCronulot Fill. TYPICAL SECTION OF REPAIR TO WEST PIER - 1958 Figure 288. Typical structure cross sections Great Sodus Bay Harbor, New York 419. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. Army. Corps of Engineers; Repair, Evaluation, Maintenance, and Rehabilitation Research Program. [Vicksburg, Miss. : U. S. Army Engineer Waterways Experiment Station ; Springfield, Va. : available from National Technical Information Center]


Size: 2381px × 1050px
Photo credit: © Book Worm / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., boo, bookauthorunitedstatesarmycorpsofengineers, bookcentury1900