. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. INNER BREAKWATER 5CCT10N AT J TEAR OP COMPLETION lOflO CONCRETE SuPR BUILT )«aO RUBBLE AOOeO 1958. INNER BREAKWATER SECTION AT U YEAR OF COMPLETION 1874 CONCRETE 3UPB BUILT 1934 Figure 98, Typical structure cross sections, Chicago Harbor, Illinois 164. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Rober


. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. INNER BREAKWATER 5CCT10N AT J TEAR OP COMPLETION lOflO CONCRETE SuPR BUILT )«aO RUBBLE AOOeO 1958. INNER BREAKWATER SECTION AT U YEAR OF COMPLETION 1874 CONCRETE 3UPB BUILT 1934 Figure 98, Typical structure cross sections, Chicago Harbor, Illinois 164. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. Army. Corps of Engineers; Repair, Evaluation, Maintenance, and Rehabilitation Research Program. [Vicksburg, Miss. : U. S. Army Engineer Waterways Experiment Station ; Springfield, Va. : available from National Technical Information Center]


Size: 1933px × 1292px
Photo credit: © Book Worm / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., boo, bookauthorunitedstatesarmycorpsofengineers, bookcentury1900