190710-N-N2201-058 NEWPORT NEWS, Va. (July 10, 2019) Shipyard workers watch as the upper bow unit of the future aircraft carrier USS John F. Kennedy (CVN 79) is fitted to the primary structure of the ship, July 10, 2019, at Huntington Ingalls Industries Newport News Shipbuilding. John F. Kennedy is the second Gerald R. Ford-class aircraft carrier and the second aircraft carrier to be named after the 35th president. The 1,096-foot hull is longer than three football fields and more than 3,000 shipbuilders and 2,000 suppliers from across the country are supporting construction of the ship. The ch
190710-N-N2201-058 NEWPORT NEWS, Va. (July 10, 2019) Shipyard workers watch as the upper bow unit of the future aircraft carrier USS John F. Kennedy (CVN 79) is fitted to the primary structure of the ship, July 10, 2019, at Huntington Ingalls Industries Newport News Shipbuilding. John F. Kennedy is the second Gerald R. Ford-class aircraft carrier and the second aircraft carrier to be named after the 35th president. The 1,096-foot hull is longer than three football fields and more than 3,000 shipbuilders and 2,000 suppliers from across the country are supporting construction of the ship. The christening for John F. Kennedy is scheduled for late 2019. ( Navy photo courtesy of Huntington Ingalls Industries by Matt Hildreth/Released)
Size: 4637px × 6948px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: bulk, dvids, import, nmcs