A860795 U12N MIDDLE NOTE FAC DELIVERY STALLER (Project Engineer) MAR 12 86 EG&G/NTS PHOTO LAB Publication Date: 3/12/1986 CRANES; CRANES, LIFTING (INDUSTRIAL); EDGERTON, GERMESHAUSEN & GRIER; EG&G; EQUIPMENT & INSTRUMENTS; FAC DELIVERY; FAC LOADING; HEAVY EQUIPMENT; LOADING EQUIPMENT; MALE; MEN (ADD MALE MODIFIER); MIDDLE NOTE; MIDDLE NOTE NUCLEAR TEST; MIDDLE NOTE TEST; NEVADA; NEVADA TEST SITE; NTS; NUCLEAR ENERGY TECHNOLOGY; NUCLEAR TESTING; NUCLEAR TESTS; STALLER, GEORGE; TEST SITES; TUNNELS; U12N; U12N MIDDLE NOTE; UNDERGROUND; WEAPONS RELATED historical images. 1972 - 2012. Department
A860795 U12N MIDDLE NOTE FAC DELIVERY STALLER (Project Engineer) MAR 12 86 EG&G/NTS PHOTO LAB Publication Date: 3/12/1986 CRANES; CRANES, LIFTING (INDUSTRIAL); EDGERTON, GERMESHAUSEN & GRIER; EG&G; EQUIPMENT & INSTRUMENTS; FAC DELIVERY; FAC LOADING; HEAVY EQUIPMENT; LOADING EQUIPMENT; MALE; MEN (ADD MALE MODIFIER); MIDDLE NOTE; MIDDLE NOTE NUCLEAR TEST; MIDDLE NOTE TEST; NEVADA; NEVADA TEST SITE; NTS; NUCLEAR ENERGY TECHNOLOGY; NUCLEAR TESTING; NUCLEAR TESTS; STALLER, GEORGE; TEST SITES; TUNNELS; U12N; U12N MIDDLE NOTE; UNDERGROUND; WEAPONS RELATED historical images. 1972 - 2012. Department of Energy. National Nuclear Security Administration. Photographs Related to Nuclear Weapons Testing at the Nevada Test Site.
Size: 2397px × 3003px
Photo credit: © NB/DeptComm / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: