Dolos design procedure based on Dolos design procedure based on Crescent City prototype data dolosdesignproce00melb Year: 1993 35. The Crescent City Dolos Structural Design Procedure is divided into three phases: (a) Preliminary Design, (b) Intermediate Design, and (c) Final Design. These modules, or design phases, are subsets of the break- water modular design procedure. The first phase, the preliminary or recon- naissance design phase, is a desktop study that utilizes the program CAUDAID to determine a dolos design configuration. The second phase utilizes the physical model, if necessary,


Dolos design procedure based on Dolos design procedure based on Crescent City prototype data dolosdesignproce00melb Year: 1993 35. The Crescent City Dolos Structural Design Procedure is divided into three phases: (a) Preliminary Design, (b) Intermediate Design, and (c) Final Design. These modules, or design phases, are subsets of the break- water modular design procedure. The first phase, the preliminary or recon- naissance design phase, is a desktop study that utilizes the program CAUDAID to determine a dolos design configuration. The second phase utilizes the physical model, if necessary, to verify both the design stress level and the hydrodynamic stability of the design dolos. The final phase includes evalu- ation of the design stress and, if necessary, evaluation of special strengthening schemes. 36. The path required prior to entering the dolos structural design procedure is shown in Figure 5. It includes evaluation of the project goals PROJECT PERFORMANCE REQUIREMENTS DETERMINE ENVIRONMENTAL CONDITIONS Design Event. Depth BREAKWATER DESIGN Structure Geometry, Construction Methods, Materials Figure 5. Path required before dolos design 19


Size: 1458px × 1372px
Photo credit: © Bookend / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: archive, book, drawing, historical, history, illustration, image, page, picture, print, reference, vintage