The Everglades Agricultural Area (EAA) Reservoirs construction site. From the foundation to the reservoirs, walls have been and will be constructed from sediment already located on the site. The overarching goal of the Central Everglades Planning Project (CEPP) is to improve the quantity, quality, timing, and distribution of water flows to the Everglades, Water Conservation Area 3 (WCA-3) and Everglades National Park (ENP). The purpose of the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) Reservoir Phase is to construct a 240,000 acre-foot EAA reservoir and 6


The Everglades Agricultural Area (EAA) Reservoirs construction site. From the foundation to the reservoirs, walls have been and will be constructed from sediment already located on the site. The overarching goal of the Central Everglades Planning Project (CEPP) is to improve the quantity, quality, timing, and distribution of water flows to the Everglades, Water Conservation Area 3 (WCA-3) and Everglades National Park (ENP). The purpose of the Central Everglades Planning Project (CEPP) Everglades Agricultural Area (EAA) Reservoir Phase is to construct a 240,000 acre-foot EAA reservoir and 6,500 acre-foot stormwater treatment area, and integrate with A-1 FEB operations. ( Army Photo by Brigida I. Sanchez)


Size: 4500px × 2677px
Photo credit: © APFootage / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: agricultural, area, eaa, everglades, reservoir