PFS project test lead engineer, Capt. Shawn Whitney, BAF project engineer, 1st Lt. Kevin Lasquete, and BAF Project Manager, Justin Duhart, pose for a photo in front of a B-1B Lancer inside the Benefield Anechoic Facility at Edwards Air Force Base, California, May 20. The Lancer, from the 337th Test and Evaluation Squadron, 53rd Wing, out of Dyess Air Force Base, Texas, will be used to conduct testing of PFS


Size: 2108px × 1186px
Photo credit: © Operation 2021 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: -1b, 412th, 53rd, air, center, command, force, global, lancer, materiel, strike, test, wing