Electrical news and engineering . Falls. .\ concrete nverfliwsection 234 feet long is built across the stream bed. It is55 feet high at the deepest point in the channel. On theEast side an earth wing 1050 feet long has been constructedwith a concrete core wall, and on the west side a similarconstruction 700 feet long, making the total length 1974 are 8432 cubic yards of concrete and 38,962 cubicyards of earth embankment in this structure. The water hasalready reached a level within four feet of the overflow andthe structure appears to be 100% efficient thus far. Three side dams were


Electrical news and engineering . Falls. .\ concrete nverfliwsection 234 feet long is built across the stream bed. It is55 feet high at the deepest point in the channel. On theEast side an earth wing 1050 feet long has been constructedwith a concrete core wall, and on the west side a similarconstruction 700 feet long, making the total length 1974 are 8432 cubic yards of concrete and 38,962 cubicyards of earth embankment in this structure. The water hasalready reached a level within four feet of the overflow andthe structure appears to be 100% efficient thus far. Three side dams were required in this case also. Thesewere built of earth, rip-rapped on the water side, as are allthe earth dams, and contain 21,463 cubic yards of embank-ment. The area of the pond will be 500 acres. A canal 900 feet long extends from a point above theeastern end of the main dam to the concrete intake houselocated betlween two solid rock banks. Storage Dams on the East Branch Dams at the fiit of .Mva will raise the water 19. \_zATii^ HP Turbine I W 2- 3670 MR Turbines Profile of Musquash hydro electric plant showing h power house is supplied by two pipe lines THE ELECTRICAL NEWS


Size: 2595px × 963px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bo, bookcentury1800, bookdecade1890, bookidelectricalnewsen31donm