workers fixing a transition piece into place on the Walney offshore wind farm, Cumbria, UK.
The jack up barge, The Goliath lifting a 320 tonne transition piece into place on the Walney Offshore windfarm project, off Barrow in Furness, Cumbria, UK. When finished it will have 102, MW turbines, giving a total capacity of the Walney project of MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy.
Size: 4368px × 2912px
Photo credit: © Ashley Cooper pics / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: barge, barrow, carbon, coast, color, colorful, construction, crane, crew, cumbria, deck, employment, energy, engineering, environment, farm, furness, goliath, green, hand, heavy, industry, investment, irish, jack, job, lift, lifting, man, neutral, night, offshore, piece, power, ppe, renewable, sea, shift, shore, steel, time, transition, turbine, uk, walney, weight, wind, worker, yellow