Ontario Sessional Papers, 1920, . g obtained on the 110,000-volt lightning arrester and it i-expected that the order will be placed in December. Drawings of the building are being prepared and the erection of the buildii!.will be proceeded with early in 1920. CENTRAL ONTARIO SYSTEM HEALEY FALLS GENERATING STATION The generator purchased from the Swedish General ElectritCompany was installed and placed in operation on September 24, 1919. Thismachine is known as Xo. 4 generator. Complet-e tests were made by the Com-missions engineers before the generator was placed in servic


Ontario Sessional Papers, 1920, . g obtained on the 110,000-volt lightning arrester and it i-expected that the order will be placed in December. Drawings of the building are being prepared and the erection of the buildii!.will be proceeded with early in 1920. CENTRAL ONTARIO SYSTEM HEALEY FALLS GENERATING STATION The generator purchased from the Swedish General ElectritCompany was installed and placed in operation on September 24, 1919. Thismachine is known as Xo. 4 generator. Complet-e tests were made by the Com-missions engineers before the generator was placed in service. Instructions have been received to purchase and instal equiimient for Xo. 4outgoing 44,000-volt line, which will deliver power to the tie line now underconstruction between Healey Falls and Peterboro. This equipment is expected tohe readv for service earlv in 1920. ^Z^/ii/r^LOnr/wiiS D -KEY— Po/rer /fofyses or u^ff^^ Cc^y/rcc^O^ 1 1 1 l 1 HYDROELECTRIC POWER COWMISSIOM orOtiTAffioCtriTRAL OriTARio SrsTCM •J»<rl/y C-IS4 o/Oa^S .. r 1920 HYDRO-ELECTRIC POWER COMMISSION 209 ^ RANNEVS FALLS DEVELOPMENT * On account of the cesfatioii of lio^tilities partly due tu volume of otherwork, the electrical and building designs for the Ranue)-s Falls development havenot been proceeded with. Some further investigation of the proposed develojuneuthas been carried out, however, during the past j-ear. It is expected that this development will be started earlj- in 102ii. AUBURN TRANSFORMER AND SWITCHING STATIONS When it was decided to run a 44,000-volt tie from Healej Falls connectingstation to the Auburn Transformer Station at Peterboro, some changes had to bemade in the switching tower at the Auburn Station. Outdoor equipment waschosen and arrangements are being made to iustal a Canadian Westingliouse44:,000-volt, type , electrically operated, oil circuit breaker, and a setof air-iiLsulated current transformers which will be built by the Commission. At the present time, a


Size: 1884px × 1327px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthorontariol, bookcentury1900, bookdecade1920, bookyear1920