. Annual report 1920. of erecting two additional physical circuits, and the resultsobtained since the completion of this work show clearly that we were well advisedin handling same in the manner stated. The engineering details were handledby the Operating Departments Telephone Engineer, and the field work by theline maintenance section of the Operating Department. Outdoor 110,000-volt switching structures were erected at our Brant amiWoodstock High-Tension Stations, tapping the through line from Dundas toLondon at these points, and having the necessary switches for sectionalizing the linefor m


. Annual report 1920. of erecting two additional physical circuits, and the resultsobtained since the completion of this work show clearly that we were well advisedin handling same in the manner stated. The engineering details were handledby the Operating Departments Telephone Engineer, and the field work by theline maintenance section of the Operating Department. Outdoor 110,000-volt switching structures were erected at our Brant amiWoodstock High-Tension Stations, tapping the through line from Dundas toLondon at these points, and having the necessary switches for sectionalizing the linefor maintenance and operating purposes. The increased flexibility in the opera-tion of the high-tension line between Dundas and London and the benefits derivedby reason of same during insulator testing periods much more than compensatesthe expense in erecting such structures. In connection with the double circuitingduring the coming year of the high-tension line between Dundas and Kitchener, ifiil I ?5 u * 1 1 i 25 * •. III s I Hiiinff iiiiiti 1 p rnrfi fin IHI Elill him 9Mitipo fi


Size: 987px × 2533px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthorontarioh, bookcentury1900, bookdecade1920, bookyear1920