Highway bridge pier No. 2 showing ground leveled to elevation 942, preparatory to driving piling for enlargement of the pier.; Scope and content: Photograph from Volume Two of a series of photo albums documenting the construction of the Grand Coulee Dam and related work on the Columbia Basin Project.


Size: 4964px × 4027px
Photo credit: © Alpha Stock / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: