![](http://www.alamy.com/thumbs/6/6E8B0E59-57F4-47C4-B69B-2F6CA5ADD6F2/2CNXHX4.jpg)
. Railway mechanical engineer . making new patterns. These patterns would cost approxi-mately $55 to $65 each, and would be used at rare intervals-after the original application. It was found that the upperpwtion of the steam pipes for the Mikado superheater en-. Fig. 2.—Method of Cutting and Welding Steam Pipes gines could be used with the lower portion of the steam pipes-removed from engines being converted, by welding them to-gether by the oxweld process. The steam pipes of the-Mikado engines were of the outside type. Fig. 1 shows the-two steam pipes used; the one on the left is that taken
. Railway mechanical engineer . making new patterns. These patterns would cost approxi-mately $55 to $65 each, and would be used at rare intervals-after the original application. It was found that the upperpwtion of the steam pipes for the Mikado superheater en-. Fig. 2.—Method of Cutting and Welding Steam Pipes gines could be used with the lower portion of the steam pipes-removed from engines being converted, by welding them to-gether by the oxweld process. The steam pipes of the-Mikado engines were of the outside type. Fig. 1 shows the-two steam pipes used; the one on the left is that taken from,one of the engines being converted and the one on the rightis the Mikado steam pipe. Fig. 2 shows where the steam pipes were cut and howclosely the) matched. The pipes were laid off according to-
Size: 1648px × 1516px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1910, booksubjectrailroadengineering