Wind turbines being prepared by Siemens at Mostyn Port for onward travel to the Walney offshore wind farm.


The Walney Offshore Windfarm project is located 15km off Barrow in Furness in Cumbria. The project consists of Walney 1 and Walney 2 each with 51 turbines. When finished it will have 102 MW turbines, giving a total capacity of the Walney project of MW, enough to power 320,000 homes. The rotor diameter of the turbines is 107m for Walney 1 and 120 m for Walney 2. The wind farm is owned and constructed by Dong Energy. The Turbines are manufactured by Siemens in Denmark, then shipped to the port of Mostyn in north Wales, where they are put together before being shipped up the the Walney site.


Size: 5616px × 3744px
Photo credit: © Ashley Cooper / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: change, clean, climate, coast, company, cone, construction, dock, dong, electricity, energy, farm, global, green, mostyn, north, nose, offshore, port, power, renewable, shore, siemens, steel, technology, turbine, wales, walney, warming, wind