Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view from floor of Outlet building showing top of existing concrete to be removed for relief valve connection to 48 in. line, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 8, 1946


Size: 4010px × 2500px
Photo credit: © piemags/DCM / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: