. Annual report 1920. ulic Plant at Nipissing. The erectionof these storage dams allowing more suitable control of the flow of the river hasbeen a great benefit to this system. Although load was higher than last yearit was not necessary to operate the steam plant this summer or fall with theexception of a short time when the hydraulic plant at Nipissing was shut downwhen the new trash racks were being installed at the headlock to replace theracks damaged by ice several years ago. A new bridge was erected over the pipe line near the plant in order to trans-port the heavy equipment in connection


. Annual report 1920. ulic Plant at Nipissing. The erectionof these storage dams allowing more suitable control of the flow of the river hasbeen a great benefit to this system. Although load was higher than last yearit was not necessary to operate the steam plant this summer or fall with theexception of a short time when the hydraulic plant at Nipissing was shut downwhen the new trash racks were being installed at the headlock to replace theracks damaged by ice several years ago. A new bridge was erected over the pipe line near the plant in order to trans-port the heavy equipment in connection with the proposed extension at this maintenance work was carried out in connection with the woodstave pipe line and headlock controlling same. The turbine equipment at this plant was overhauled and put in good operat-ing condition. Nipissing System Municipality Load in , 1919 Load in , 1920 Increase North . 1,134 97 39 3 222 84 40 3 881 b CDD ca. KfY Power Mouse & Snitch/no S/b//an7ro/7Sfor/7?er/hose & Sw//c/7/rrf*S/a//onPower/fovses5t/6 S/cr//os?3SmYe/t/rttfSfcrf/ons?5/a//b/?sS-Z//?es//r-Sery/ceS/cr/zonsSI-Z/hes Pro/iosec/or i/r/aer Co/7s/rt/cf/o/? C/fMDEH HYDRO-ELECTRIC POWER COMMISSION ofOntarioCentral Ontario System Ocfoher 25-/9 OcrJO. 19/9. 0CT-3O-/9SO 5uperste//nff C-/S4 qfOcnZS-zs//: 1921 HYDROELECTRIC (POWER COMMISSION 19 Thunder Bay System During the past year very satisfactory operation has been obtained on theThunder Bay System. The Kaministiquia Power Company have maintained a verygood standard of service. Due to the growth of the load taken by Port Arthur,it has been found necessary to increase the power held in reserve from theKaministiquia Power Company from 6,000 to 7,000 horse-power. Owing to the growth of the demand for power in certain sections of the citycertain changes in the substation equipment would have been advisable, had itnot been for the fact that power will be disc


Size: 2069px × 1207px
Photo credit: © The Reading Room / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauthorontarioh, bookcentury1900, bookdecade1920, bookyear1920