Contract No. 19, Dam and Substructure of Ware River Intake Works at Shaft 8, Wachusett-Coldbrook Tunnel, Barre, flume at lower end mill head race, Barre, Mass., Aug. 12, 1929


Size: 4085px × 2514px
Photo credit: © piemags/DCM / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: