. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. SECTION- HI SOUTH PIER 33 5 TO 39 5. SHEET PILING SOUTH PIER Figure 128. Typical south pier cross sections. Grand Haven Harbor, Michigan 209. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. Army. Corps of Engineers; Repair, Evaluat


. Case histories of Corps breakwater and jetty structures. Report 3. Breakwaters; Jetties; Breakwaters; Jetties. SECTION- HI SOUTH PIER 33 5 TO 39 5. SHEET PILING SOUTH PIER Figure 128. Typical south pier cross sections. Grand Haven Harbor, Michigan 209. Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original Bottin, Robert R; U. S. Army Engineer Waterways Experiment Station; United States. Army. Corps of Engineers; Repair, Evaluation, Maintenance, and Rehabilitation Research Program. [Vicksburg, Miss. : U. S. Army Engineer Waterways Experiment Station ; Springfield, Va. : available from National Technical Information Center]


Size: 1913px × 1306px
Photo credit: © Book Worm / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., boo, bookauthorunitedstatesarmycorpsofengineers, bookcentury1900