Corps of Engineers Safety Specialist Ron Mulvey (left) oversees the physical demobilization of the Yabucoa Substation mega-generator, Yabucoa, Puerto Rico, August 18, 2018. The Puerto Rico Electric Power Authority (PREPA) determined there is sufficient power generation and/or transmission at the Yabucoa Substation and requested the Army Corps of Engineers demobilize the mega-generator at Yabucoa. The demobilization of the mega-generators is a positive step in the ongoing recovery process in Puerto Rico.


Size: 6000px × 4000px
Photo credit: © AB Forces News Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: corps, engineers, fema, hurricane, maria, power, puerto, recovery, rico, temporary, usace