. Electric railway journal . Note;-Ail Sled Ties to be 6*8 Long and fitted with Clips and Bolts. Fig. 1—Oklahoma Track—Concrete and Steel Tie Construction EUctric Ry, Journal. many new and interesting features in connection with financingand building the street railway system in that city. There areat present about 110 miles of paved streets. Nearly all of this Standard Cat<tb U«. than a mile of the center of the city and radiates in every direc-tion, thus providing means for quick transit to the suburbanportions of the city and very good outlets for interurban service. STEEL TIE TRACK IN P


. Electric railway journal . Note;-Ail Sled Ties to be 6*8 Long and fitted with Clips and Bolts. Fig. 1—Oklahoma Track—Concrete and Steel Tie Construction EUctric Ry, Journal. many new and interesting features in connection with financingand building the street railway system in that city. There areat present about 110 miles of paved streets. Nearly all of this Standard Cat<tb U«. than a mile of the center of the city and radiates in every direc-tion, thus providing means for quick transit to the suburbanportions of the city and very good outlets for interurban service. STEEL TIE TRACK IN PAVED STREETS The companys present standard construction in paved streetsconsists of 100-lb. rail A. S. C. E. section laid on CarnegieM-25 T-section steel ties having 6-in. tops. These ties arespaced 3 ft. apart and embedded in concrete, as shown in Fig. construction incorporates two continuous concrete girders22 in. wide x 12 in. deep extending longitudinally under the -A Brick Paviu II. ij/i mam 8Vitrified Tile Drainslaid with Open TileHalf Section on Private Right of Way.


Size: 1970px × 1268px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookcentury1900, bookdecade1900, bookidelectricrailway371911newy