. Distribution of dredged material at the Rockland Disposal Site, May 1985. Waste disposal in the ocean. NORTH 9 mg/1 at 10:07 EST — Buo. at 09\^5 EST 950 mg/1 at 09 Figure 3-2. Results of the plume study conducted at Rockland Disposal Site on 21 May 1985. Axes are centered at disposal location. Distances in Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original United States. Army. Corps of Engineers. New England Divisio
. Distribution of dredged material at the Rockland Disposal Site, May 1985. Waste disposal in the ocean. NORTH 9 mg/1 at 10:07 EST — Buo. at 09\^5 EST 950 mg/1 at 09 Figure 3-2. Results of the plume study conducted at Rockland Disposal Site on 21 May 1985. Axes are centered at disposal location. Distances in Please note that these images are extracted from scanned page images that may have been digitally enhanced for readability - coloration and appearance of these illustrations may not perfectly resemble the original United States. Army. Corps of Engineers. New England Division; Science Applications International Corporation. Waltham, MA : U. S. Army Corps of Engineers, New England Division
Size: 1540px × 1623px
Photo credit: © Paul Fearn / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bo, bookcentury1900, bookcollectionbiodiversity, bookleafnumber63