Inside the Rotation, Processing and Surge Facility at NASA’s Kennedy Space Center in Florida on Nov. 17, 2020, the left and right booster segments for the Space Launch System are being prepared for their move to the Vehicle Assembly Building (VAB). Workers with Exploration Ground Systems and contractor Jacobs teams will stack the twin five-segment boosters on the mobile launcher inside the VAB over a number of weeks. When the core stage arrives, it will join the boosters on the mobile launcher, followed by the interim cryogenic propulsion stage and Orion spacecraft. Manufactured by Northrop Gr


Inside the Rotation, Processing and Surge Facility at NASA’s Kennedy Space Center in Florida on Nov. 17, 2020, the left and right booster segments for the Space Launch System are being prepared for their move to the Vehicle Assembly Building (VAB). Workers with Exploration Ground Systems and contractor Jacobs teams will stack the twin five-segment boosters on the mobile launcher inside the VAB over a number of weeks. When the core stage arrives, it will join the boosters on the mobile launcher, followed by the interim cryogenic propulsion stage and Orion spacecraft. Manufactured by Northrop Grumman in Utah, the twin boosters provide more than 75 percent of the total SLS thrust at launch. Under the Artemis program, NASA will land the first woman and the next man on the Moon by 2024. The first in a series of increasingly complex missions, Artemis I will test the Orion spacecraft and SLS as an integrated system ahead of crewed flights to the Moon.


Size: 6720px × 4480px
Photo credit: © NASA/piemags / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: artemis, booster, boosters, launch, mars, moon, rocket, segments, sls, solid, space, system