170823-N-VB241-018 BREMERTON, Wash. (Aug. 23, 2017) Airman Bethany Frazier, from Tri-Cities, Washington, and Airman Thomas Prosser, from Tacoma, Washington, check the condition of a watertight door in the hangar bay aboard USS John C. Stennis (CVN 74). John C. Stennis is conducting a planned incremental availability (PIA) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility, during which the ship is undergoing scheduled maintenance and upgrades. John C. Stennis is in port training for future operations after completing its planned incremental availability (PIA) at Puget Sound N


170823-N-VB241-018 BREMERTON, Wash. (Aug. 23, 2017) Airman Bethany Frazier, from Tri-Cities, Washington, and Airman Thomas Prosser, from Tacoma, Washington, check the condition of a watertight door in the hangar bay aboard USS John C. Stennis (CVN 74). John C. Stennis is conducting a planned incremental availability (PIA) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility, during which the ship is undergoing scheduled maintenance and upgrades. John C. Stennis is in port training for future operations after completing its planned incremental availability (PIA) at Puget Sound Naval Shipyard and Intermediate Maintenance Facility five days ahead of schedule. During PIA, the ship and shipyard team accomplished the largest work package ever for an aircraft carrier in a six-month availability. ( Navy photo by Mass Communication Specialist 3rd Class Zachary C. Wolfe/Released)


Size: 2100px × 1402px
Photo credit: © AB Forces News Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., 74, cvn, john, stennis, uss