A Army Corps of Engineers, Baltimore District, inflow pipeline pumps a dredged material slur into a containment cell at Poplar Island in Talbot County, Md., Aug. 3, 2021. The dredged material is mechanically dredged from the channel and loaded onto a scow (barge), then pushed down the Chesapeake Bay by tugboat to Poplar Island. The operation showcases the first dredged material pumped into Poplar Island Expansion Cell 11.
Size: 2700px × 1800px
Photo credit: © Operation 2021 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: