Contract No. 150, Installation of a Waterwheel, Generator, Switchgear, Transformer, Substation, and the Construction of a Transmission Line, Winsor Dam Power Plant, Belchertown, view down through floor of Outlet Works showing draft tube ring, in northeasterly corner of basement, on which turbine is to be placed, Winsor Dam, Quabbin Reservoir, Belchertown, Mass., Mar. 7, 1946


Size: 3998px × 2478px
Photo credit: © piemags/DCM / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: