. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . e unloader andstring the cable or thematerial be unloaded by hand. So much time isconsumed that regular train service often interferesfurther with the working time; and as a consequencethe material is unloaded any place to get rid of it, oftenwhere it is not needed, while the place that does needit is neglected. The dump car train can go out to endof the cut and dump, shoot back into the cut andwork until smoke of the tra


. Building a railroad; a handbook devoted to a new, speedy and economical method of performing every operation from grading right-of-way to ballasting and maintaining track . e unloader andstring the cable or thematerial be unloaded by hand. So much time isconsumed that regular train service often interferesfurther with the working time; and as a consequencethe material is unloaded any place to get rid of it, oftenwhere it is not needed, while the place that does needit is neglected. The dump car train can go out to endof the cut and dump, shoot back into the cut andwork until smoke of the train they are to clear for isin sight, then get out of the way. Here is another saving: A light engine that willpull this train can be used without its being necessaryto take a heavier engine from freight sevice that would be required to pulltrain. The machine op-erating expense is less, asthere is no occasion toshift the portable tracksections and a laborer isnot required to assist inmoving them. Themachine operator andfireman usually completethe machine and ditch-ing crew. This methodmight appeal to the newroad not yet equippedwith flat cars. the heavier flat car work. Unloading at the Dump 49 Building a Railroad


Size: 1810px × 1380px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: ., bookauth, bookcentury1900, bookdecade1910, bookidcu31924004135566