Werking Merwedekanaal Kanaalgedeelte between the Zeijlweg under Maarsen and the barrier lock proved Utrecht. Ground diver under the canal on the diverted Proostwetering, consisting of 4 cast iron tubes, each of 1 M inner midline. Position on the future weste Date: 26 June 1890 Location: Maarssen, Utrecht, Utrecht (prov.) Keywords: ground divers, channels, hydraulic engineering
Size: 3094px × 2262px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: