In order to remove the May 18, 1980 sediment deposits, and to keep up with new sedimentation, the Army Corps of Engineers began a dredging program on the Toutle (shown here), the Cowlitz, and the Columbia Rivers. By 1987, nearly 140 million cubic yards (110 million meters) of material had been removed from the channels. This is enough material to build twelve lanes of highway, one-foot thick, from New York to San Francisco.


In order to remove the May 18, 1980 sediment deposits, and to keep up with new sedimentation, the Army Corps of Engineers began a dredging program on the Toutle (shown here), the Cowlitz, and the Columbia Rivers. By 1987, nearly 140 million cubic yards (110 million meters) of material had been removed from the channels. This is enough material to build twelve lanes of highway, one-foot thick, from New York to San Francisco.


Size: 4242px × 2827px
Photo credit: © CPC Collection / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: .., 18, 1980, army, began, corps, deposits, dredging, engineers, material, order, program, remove, sediment, sedimentation, toutle