. Electric railway journal . 932 Electric Railway Journal Vol. 55, No. 19 The signaling at the branch-off or junction is suchthat southbound cars are given either an indication tothe main track (straight) or to the branch and north-bound cars from the main line or from the branch, thesignals being selected according to routes establishedby the position of the switch in advance. These signals are also a part of the block system andas such are controlled by track circuit to the next sig- 2-/0-. Post---
Size: 1465px × 1705px
Photo credit: © Reading Room 2020 / Alamy / Afripics
License: Licensed
Model Released: No
Keywords: ., bookcentury1900, bookdecade1900, bookpublishernewyorkmcgrawhillp