Lock heads beoosten Sas van Gent Description: Security works at overlock east side. Water rose to 3,50 M below Seen from the south-west side Annotation: Extension of the Canal from Ghent to Terneuzen, with locks near Terneuzen and Sas van Gent, bridges at Terneuzen, Sas van Gent and Sluiskil and an electric power station at Terneuzen Date: 7 February 1906 Location: Sas van Gent, Sas van Gent, Terneuzen, Terneuzen, Zeeland, Zeeland Keywords: security works, dukdalven, canal works, braking works, lock heads, waterworks


Size: 2869px × 2438px
Photo credit: © BNA Photographic / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: