(Petronas) first floating liquefied natural gas (PFLNG 1) facility, also known as PFLNG SATU, was developed for the Kanowit gas field
The front-end engineering and design (FEED) of the facility was undertaken by Technip Daewoo Consortium (TDC), a joint venture (JV) between Technip and Daewoo Shipbuilding & Marine Engineering (DSME). TDC received the FEED contract from Petronas Floating LNG 1 (Labuan), a subsidiary of PETRONAS, in December 2010 and is also responsible for the construction of the facility. PFLNG SATU was constructed at Daewoo’s shipyard in Okpo, South Korea. The facility was towed to its location, 180km offshore of Bintulu, in 2016. It has a processing capacity of million tonnes of LNG a year.
Size: 6016px × 4016px
Location: bintulu, serawak, malaysia
Photo credit: © Rusdi Sembak / Alamy / Afripics
License: Royalty Free
Model Released: No
Keywords: &, 1, agreement, arrangemen, assets, business, career, cargo, class, costs, cryogenic, danger, design, det, develop, development, energy, engineering, equipment, evacuate, expertise, explored, facilities, facility, fields, floating, gas, global, high, infrastructures, license, liquefaction, lng, malaysia, marine, market, modules, mooring, natural, norske, offshore, oil, pflng, plants, portfolio, process, production, remote, reputation, reserves., risk, share, storage, structure, subcontract, subsea, supply, tanks, technical, technology, veritas