Road crossing at the railway station The construction of electric power on the ore track. Since the work had begun in 1917, these were conducted so that electric power could be introduced between Kiruna and Gällivare on March 12, 1920. In 1921, electric drive was ready for Rip on February 8, to Kilvo on August and night laid In October. To Boden came to March 20, 1922 to finally reach the final point of Svartön outside Luleå on June 21.


Size: 2633px × 1898px
Photo credit: © EU/SRM / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: museum, railway, swedish