Theme photo Emscher reconstruction, the Emscher system will be free of wastewater in 2021 - construction of a new sewer on the Boye, the second larges


Theme photo Emscher reconstruction, the Emscher system will be free of wastewater in 2021 - construction of a new sewer on the Boye, the second largest tributary of the Emscher, the tunnelling machine digs the tunnel for the DN 3500 concrete wastewater pipes, the Boye is renaturalized, is transformed into a near-natural watercourse, was previously an open, surface sewer, combined sewer with surface water and wastewater, the ecological reconstruction of the Emscher system consists of the construction of a central wastewater treatment system in the Ruhr area, the construction of sewers and the renaturation of the Emscher and its tributaries, archive photo from 13. , Bottrop, Ruhr area, North Rhine-Westphalia, Germany.


Size: 3840px × 5760px
Photo credit: © Rupert Oberhäuser / Alamy / Afripics
License: Licensed
Model Released: No

Keywords: 3500, area, bgi, blue-green, bodies, boring, bottrop, boye, building, canal, canalization, civil, concrete, conservation, construction, digging, dn, drill, drilling, driving, earth, ecological, ecology, economy, emscher, engineering, environment, environmental, europe, european, format, free, german, germany, green-blue, green-blue-infrastructure, head, hf, industry, infrastructure, investment, machine, management, measure, nature, north, nrw, pipe, pipes, project, protection, reconstruction, renaturation, resource, resources, rhine-westphalia, river, ruhr, sewage, sewer, site, system, technology, tube, tunnel, underground, vertical, vtm, wastewater, water, watercourse